I finished the empennage (tail) back in March. I was dreading the trailing edge, but things went really well. Here are some pictures.
The finished Left Elevator.

A close-up of a double-flush rivet.

Rolling the leading edge of the rudder.
After I got the empennage finished I moved the quick-build wings into my workshop.
DJ
No comments:
Post a Comment